GMT Pallet Factory News

  • Concremix, Brazil Orders 8,000 GMT Pallets for Its Concrete Block Factory
    08-25/2026
    Concremix, a Brazilian concrete block factory, ordered 8,000 GMT pallets in 700×520×25mm to replace wooden pallets prone to moisture, bending, deformation, and warped edges, improving production efficiency and brick quality.
  • Ghana Client Orders 40,000 GMT Pallets for QGM Machines
    07-31/2026
    A Ghanaian distributor purchased 40,000 pieces 850x550x25mm GMT pallets for West African block plants. Discover why the fiberglass pallet outperforms wood and steel pallets in durability, cost, and flatness. Read the full GMT pallet case study.
  • 10,000 GMT Pallets Pass Brazil Govt Inspection
    07-14/2026
    In July 2026, GMT Pallet Manufacturing secured a government-backed order in Brazil for 10,000 units of 700x520x25mm GMT brick machine pallets. The client decided within 7 days, production completed in 15 days, and an independent inspection verified load capacity, bending strength, impact resistance, and tight dimensional tolerances. All GMT pallets passed with zero defects.
  • 2 Containers of 70% Black GMT Pallets Shipped to Peru
    06-25/2026
    We recently shipped 2 containers of 70% black GMT pallets to a customer in Peru. The pallet size for this order is 1400×700×32mm. The customer had previously been using wooden pallets, but frequent cracking, water absorption, and short service life caused increasing production problems. After reviewing the project, we recommended a stronger fiberglass GMT pallet solution for more stable concrete block production.
  • Block Pallet Factory Shines at Canton Fair – High-Density GMT Pallets Attract Global Buyers
    05-29/2026
    Block Pallet Factory made a strong impression at the 137th Canton Fair (April 15‑19, 2026), presenting its latest gmt pallet series produced on a new 3600‑ton hydraulic press. Over 60 buyers from Brazil, Indonesia, Ghana, and Europe visited the booth. Several customers placed trial orders on site and took away samples. The company’s steel‑edge solution and high‑density technology were the main attractions.
  • Third GMT Pallet Production Line Added – Faster Delivery
    05-11/2026
    GMT pallet orders increased 30% year over year. Two lines could no longer ensure stable delivery. So we invested in a third production line in February, which came online on May 15. Delivery lead time is now fixed at 10 days, pallet density increased by 6%, powered by a new 3200‑ton hydraulic press.

Get the latest price? We will reply as soon as possible (within 12 hours)